The city subway is being extended to include a new stop in a large open plaza. the entrance to the new stop needs to be both architecturally distinctive and energy efficient, and it must fit within the budget. as part of your summer job with the department of transportation (dot), you've been asked to review three design ideas and recommend which firm should develop its idea into a full design proposal