art contractors must locate an equipment staging area to serve three construction sites, located at (x,y) coordinates (0,3), (1,4) and (5,5). traffic between the staging area and each of the sites is 30 trips a week, except for the site located at (5,5), which is only 10 trips a week. what is the best set of co-ordinates for the equipment staging area?