From the first floor to the fourth floor, the elevator's net work during the entire trip is -3mgh.
Given,
On the first floor of a building, an elevator with mass m is initially at rest. It ascends at a constant speed, passing second and third floors before coming to a stop at the fourth floor.
the separation between the floors is h
The distance from the first floor to the fourth floor Equals 3 hours of work = -mg(3 hours)
= -3mgh
Work Done = -3mgh
Learn more about Work done here:
https://brainly.com/question/13662169
#SPJ4