Answer :
If all requirements are known up front and functionality for all requirments can be built at the same time, Incremental software development method would be used.
When developing software using the incremental build model, the product is conceived, implemented, and tested gradually (a bit more is added each time) until it is complete.
It requires both creation and upkeep. When a product satisfies all of its requirements, it is said to be finished. The waterfall model's components are combined with prototyping's iterative concept in this paradigm.
The item is broken down into a number of parts, each of which is designed and constructed separately (termed as builds). When finished, each component is sent to the client.
As a result, only a portion of the product can be used, saving time during development. Additionally, it saves a substantial initial capital expenditure and a protracted waiting period.
To learn more about Software Model here
https://brainly.com/question/18369405
#SPJ4