Example 7.2. The estimated quantity of water expected to flow open channel is 2 m³/sec. Design the cross section and L-slope of drain. Allowable velocity of flow is 1 m/sec. Sol. Q==AV 2=.4 x 1 or A=2m Assume base width 1 m, depth of water 1 m and side slope 1:1