An auto tunnel through a mountain is being planned. It will be in the shape of a semicircular cylinder with radius of 10 m, and a length of 10 km. How many cubic meters of dirt will need to be removed? If the bed of each dump truck has dimensions 2.2m by 4.8m by 1.8 m, how many loads will be required to carry away the dirt?