A construction worker is pouring concrete stairs. The first step requires 1. 8 cubic feet of concrete, and the first 5 steps require a total of 27 cubic feet. If the steps follow an arithmetic series, how much concrete is required for the first 12 steps? 259. 2 cubic feet 43. 2 cubic feet 156 cubic feet 140. 4 cubic feet.