the cost engineer of a project management group has developed a simple regression model for costing each floor of a high rise project. the model has an intercept of 100k and the slope or gradient is shown to be an increase of $278 per added square feet plus $20000 per added floor. what is the estimated project cost in $1000 for 20000 square feet located in the sixth floor .



Answer :

Other Questions