this problem demonstrates that although equation 10.2, from the book, for rate monotonic scheduling is a sufficient condition for successful scheduling, it is not a necessary condition (i.e., sometimes successful scheduling is possible even if equation 10.2 is not satisfied). (a) consider a task set with the following independent periodic tasks: p1 : c1