the only force acting on a 2.0 kg canister that is moving in an xy plane has a magnitude of 5.0 n. the canister initially has a velocity of 4.0 m/s in the positive x direction and some time later has a velocity of 6.0 m/s in the positive y direction. how much work is done on the canister by the 5.0 n force during this time?