A small company manufactures two products: A and B. Each product requires three operations: assembly, finishing and testing. Product A requires 1 hour of assembly, 3 hours of finishing, and 1 hour of testing. Product B requires 3 hours of assembly, 1 hour of finishing, and 1 hour of testing. The total work-hours available per week in the assembly division is 60, in finishing is 60, and in testing is 24. Each item of product A has a profit of $50, and each item of Product B has a profit of $75. How many of each should be made to maximize profit?