A Company Manufactures two types of
TV sets, which are assembled and
Finished in two workshops W₁ and W₂
Each type takes 20 hours and 10 hours
For assembly and 5 hours and 3 hours
for finishing in the respective Workshops.
If total number of hours available are
450 and 230 in Workshops W1 and W₂
respectively, calculate the number of
Units of each type be produced, Using Matrix Method.