the only force acting on a 4.4 kg canister that is moving in an xy plane has a magnitude of 5.1 n. the canister initially has a velocity of 2.6 m/s in the positive x direction, and some time later has a velocity of 6.9 m/s in the positive y direction. how much work is done on the canister by the 5.1 n force during this time?