The number N of cars produced at a certain factory in 1 day after t hours of operation is given by N(V) = 900t- 58 O st$ 10. If the cost C (in dollars) of producing N cars is C(N) = 45,000 + 5000N, find the cost C as a function of the time of the operation of the factory