The following table the installation time (in min- on 50 different computer. gives -utes) of hardware on 50 different Installation Total time (in minutes Frequency 0-10 10-20 20-30 30-40 40-50 and
10 - 10 - 50 respectively
. installation time = 30.2 minute. 4 Average Find the missing Frequencies.