Answer :

The letter A is not drawn to scale in the sketch below. construct ABC next to its below-listed sketch The amount of force applied over a specific distance is referred to as work. Since the problem already specifies the force's value and the length of the distance it is exerted across, the quantity of labor completed requires multiplying these two numbers. As demonstrated below:

work, in physics, measure of energy transfer that occurs when an object is moved over a distance by an external force at least part of which is applied in the direction of the displacement.

Work: Force times Distance

Work = 250 J x 50 N * 5 m

Work = 250 J

To learn more about Work Visit : https://brainly.com/question/1501664

#SPJ9